Third Expansion of the Holy Haram – Al Safwa Site

Earthworks, Excavation, Side Support Works & Dewatering Systems

Third Expansion of the Holy Haram – Al Safwa Site

Project Overview

Eco Vista General Contracting Co. executed specialized earthworks, excavation, side support works, and dewatering systems as part of the third expansion of the Holy Haram at Al Safwa Site in Makkah.

The project required precise execution within a sensitive environment, strict safety controls, and advanced engineering solutions to ensure stability, efficiency, and protection of surrounding structures.

Engineering Challenges

The project involved deep excavation works within limited space and close proximity to existing buildings. Ground stability and groundwater control were critical factors throughout execution.

Our Solution

Eco Vista implemented a controlled soldier pile shoring system combined with efficient dewatering solutions. This approach ensured excavation stability, protected surrounding structures, and enabled smooth progress within the project timeline.

Project Preview

Saudi Binladin Group
Dar Al-Handasah
Shoring System
170 m
9.5 m
Soldier Piles
50 Days

Don’t hesitate to contact us

Call us
+ 966 50100 9092
Email us
info@ecovista.com
Chat with us
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare