Third Expansion of the Holy Haram – Al Safwa Site
Project Overview
Eco Vista General Contracting Co. executed specialized earthworks, excavation, side support works, and dewatering systems as part of the third expansion of the Holy Haram at Al Safwa Site in Makkah.
The project required precise execution within a sensitive environment, strict safety controls, and advanced engineering solutions to ensure stability, efficiency, and protection of surrounding structures.
Engineering Challenges
The project involved deep excavation works within limited space and close proximity to existing buildings. Ground stability and groundwater control were critical factors throughout execution.
Our Solution
Eco Vista implemented a controlled soldier pile shoring system combined with efficient dewatering solutions. This approach ensured excavation stability, protected surrounding structures, and enabled smooth progress within the project timeline.