Third Expansion of the Holy Haram – Al Tawheed Site

Foundation Works, Earthworks, Excavation, Side Support Works & Dewatering Systems

Third Expansion of the Holy Haram – Al Tawheed Site

Project Overview

Eco Vista General Contracting Co. executed foundation works, earthworks, excavation, side support works, and dewatering systems as part of the third expansion of the Holy Haram at Al Tawheed Site in Makkah.

The project required advanced engineering solutions due to deep excavation levels, proximity to existing structures, and the need for continuous groundwater control, all within a highly sensitive and active area.

Engineering Challenges

The project involved deep foundation and excavation works adjacent to existing structures and infrastructure. Maintaining excavation stability and controlling groundwater levels were critical throughout execution.

Our Solution

Eco Vista implemented a robust soldier pile shoring system combined with efficient dewatering solutions. This approach ensured excavation safety, structural stability, and uninterrupted project progress while meeting strict safety and quality requirements.

Project Preview

Saudi Binladin Group
Dar Al-Handasah
Shoring System
170 m
9.5 m
Soldier Piles
50 Days

Don’t hesitate to contact us

Call us
+ 966 50100 9092
Email us
info@ecovista.com
Chat with us
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare