Third Expansion of the Holy Haram – Al Anqari Site
Project Overview
Eco Vista General Contracting Co. executed comprehensive earthworks, excavation, side support works, and dewatering systems for the third expansion of the Holy Haram at Al Anqari Site in Makkah.
The project was delivered in a highly sensitive and densely built environment, requiring precise engineering coordination, advanced shoring systems, and strict adherence to safety and quality standards.
Engineering Challenges
The project involved deep excavation works within a limited space and close proximity to existing structures. Maintaining ground stability and controlling groundwater levels were critical to ensure safe execution.
Our Solution
Eco Vista implemented a controlled soldier pile shoring system combined with efficient dewatering solutions. This approach ensured excavation stability, protected surrounding structures, and enabled smooth progress within the project timeline.
Project Preview


